Measure the base layer, not the paver thickness
The base material sits below the pavers and is separate from bedding sand and jointing material. Measure the length and width of the prepared area, then use the intended compacted base depth. A 10 cm layer is entered as 0.10 m in the volume formula. The calculator converts the depth and applies the allowance you select.
Why site conditions matter
The appropriate base depth depends on soil strength, drainage, expected loading, climate and the paving system. The calculator cannot choose a suitable construction specification. Also confirm whether your supplier quotes loose delivered volume or compacted volume, because the quantity ordered may differ from the finished layer volume.
- Measure separate areas individually and add their volumes.
- Account for edges, steps and areas where the depth changes.
- Estimate bedding sand separately; do not include it in the base depth.
- Check compaction and drainage requirements for the chosen paving system.
Use this result for preliminary material planning only. For driveways, retaining edges or other load-bearing work, follow the project specification and qualified advice.